Running workers are not output. This measures accepted results per worker-hour, cost per accepted result, and whether your instrument can see your workers at all.
Do this first. If a sampler reads the worker count on a timer, a worker that starts and finishes between two samples is recorded as zero, and every per-worker-hour number downstream becomes a lower bound rather than a measurement. No polling interval is safe for arbitrarily short workers; only per-worker start and end events are.
One measurement window: a run, a day, a sprint. Leave a field blank if you did not measure it. Blank stays unknown and never becomes zero.
Fill this in to compare two worker counts on the same task family. The verdict is on accepted output per worker-hour, not on activity.
Fill in both windows to get a verdict.
One real production system, five days, 340 instrument samples, 89 reviewed tasks. Measured, not synthetic. Observational, not a controlled experiment: the governor chose the worker count, task difficulty varied, and 85% of accepted results fell in intervals the sampler recorded as zero workers. The All row (25.2) is therefore a lower bound, not the system cost, and the 166.6 figure applies only within observed intervals. The true system-wide figure is unknown.
| Concurrent workers | Wall hours | Worker minutes | Accepted | Not accepted | Worker min / accepted |
|---|